arrow_back
menu
The Lexington Bed and Breakfast - 19
Season 10 • Episode 19
Broadcast date:  1989-01-05
 
At the front of the house, our host watches Charlie McGongagle put up a permanent drain pipe, while John Silva installs a new storm door. In the master bedroom, our master carpenter is busy trimming the windows, while Mary-Van is painting window sashes. In the basement, our host watches as Tom Silva levels the basement floor where the washer and dryer will be located using a plaster based compound. Tile is set in the upstairs bath.
chevron_left Episode 18 Episode 20 chevron_right
Cast of this episode

Show more expand_more
keyboard_double_arrow_down