arrow_back
menu
The Napa Valley House - 3
Season 16 • Episode 21
Broadcast date:  1995-02-15
 
After a period of heavy rains and flooding, Napa Valley - and the jobsite - are a soggy mess. The show opens in sandbagged downtown Napa, then head to the job, where foreman Jeff Castille and crew have spent the week levelling the kitchen area with steel beams and hydraulic jacks. Jeff shows us the water level he used. Outside, the concrete truck arrives to pump in the mix for the steam walls. On site, our master carpenter visits a rammed-earth house being constructed on a nearby hillside. Our host checks out the condition of Dennis's roof with roofing contractor Mike McDermott, and Richard Trethewey takes Dennis to a San Francisco bath showroom to consider choices for his bathroom and kitchen.
chevron_left Episode 20 Episode 22 chevron_right
Cast of this episode

Show more expand_more
keyboard_double_arrow_down