arrow_back
menu
The Watertown House - 13
Season 20 • Episode 13
Broadcast date:  1998-12-19
 
Exterior painting by Steve Kiernan and crew is underway out back, as is the erection of a white cedar combination fence and trellis along the driveway. In the kitchen, Fred Morgan explains to us the ancient process of terrazzo flooring, with a modern twist: instead of concrete, epoxy is used. Drywaller Mike Couillard shows us a tiler backing board, that unlike cementitous board, can be worked with regular drywall tools, as well as 56"" wide drywall sheets that eliminate a seam when used in high-ceiled rooms such as ours. In the basement, Bill Clayton takes us through the perimeter drain and sump system his company has installed to deal with the flooding the house suffers during heavy rains. Roger Cook and crew unload trees and shrubs from a local nursery and begin sitting them around the yard. Finally, our host gets a lesson in granite work as Lenny Belliveau completes the foundation's stone veneer.
chevron_left Episode 12 Episode 14 chevron_right
Cast of this episode

Show more expand_more
keyboard_double_arrow_down