Broadcast date
2014-10-04 • 26 episodes
Charlestown 2014; Lexington Project 2015; Veteran's House 2015
Episodes of this season
1. Charlestown 2014: Part 1: 35 Years of This Old House
event 2014-10-04
Season 36 opens in Boston, where an 1850s-era Greek Revival house is to be upgraded. The homeowner would like to improve the kitchen and the third floor, where the master suite is located. The retaining walls also need work.
2. Charlestown 2014: Part 2: Brick Rowhouse Blues
event 2014-10-11
A fix for a major problem: exterior walls that are bowing outward. Two weeks of work in the basement, meanwhile, has lowered the floor by several inches; the radiant heat-insulation system is installed; and it's shown how the roof is under-structured. In other events, Norm revisits a Charlestown townhouse featured on the show 14 years ago.
3. Charlestown 2014: Part 3: A Bridge to Charlestown
event 2014-10-18
How the old chimney will be modified for gas fireplace units. The framing progress is also spotlighted, including in the breakfast area and the third-floor master suite; and rebuilding the backyard retaining walls commences. Also: a chat with a structural engineer about one of Charlestown's most iconic structures, the Zakim Bridge; and a visit to a salvage yard that has architectural elements from the Greek Revival period.
4. Charlestown 2014: Part 4: Wood and Water
event 2014-10-25
The progress on the now-approved dormer is spotlighted. Elsewhere, Insulation and wallboard are put into place; and a reclaimed brick veneer is installed on the kitchen bump out. Also: the world's last wooden whaling ship is observed arriving at the Charlestown Navy Yard.
5. Charlestown 2014: Part 5: Gardens & Greek Revival Style
event 2014-11-01
The ductwork for the new direct vent gas fireplace units is worked on; subtle Greek Revival details are added to the interior window trim; and the exterior window trim is painted. Also: Sullivan Square Community Garden; and Beacon Hill's hidden gardens.
6. Charlestown 2014: Part 6: Kitchens and Baths
event 2014-11-08 • schedule 26m
A major upgrade begins: adding a Greek Revival-style front door. On the second floor, new wood wainscoting is installed; a feature wall insert for the master shower is created with marble basket weave tile; and small section of copper roof is added to the roof.
7. Charlestown 2014: Part 7: Rowhouse, Lighthouse
event 2014-11-15 • schedule 26m
A basement door is concealed; the new Cararra marble island top is spotlighted; a PVC fence is installed on top of the retaining wall; the front steps are given new life with a grinder, a router, epoxy and non-slip exterior paint; and the salvaged marble mantel and surround are installed in the sitting room. Also: the transformation of a Boston lighthouses into a summer home.
8. Charlestown 2014: Part 8: A Rowhouse Reimagined
event 2014-11-22
The Charlestown project wraps up. Included: restoring the exterior with a new dormer, windows, shutters and front entry; testing the security system; visiting the mechanical room in the basement; spotlighting the completed master suite; and touring the second floor, which features a guest room, guest bath and new living room.
9. Lexington Project 2015: Part 1: Colonial Roots
event 2015-01-03
This Old House kicks off the second project of the season: an addition to a 1966 Colonial in historic Lexington, Mass.
10. Lexington Project 2015: Part 2: Footings & Framing
event 2015-01-10
How the home will be renovated in stages so that the owners won't have to move out. The work begins with the back porch. Also: the framing of the first floor platform is outlined; and the building permit process is explained.
11. Lexington Project 2015: Part 3: Colonial Curb Appeal
event 2015-01-17
The second floor's front gable wall is in place; the roof framing is underway; and the framing of the new farmer's porch is spotlighted. Also: a tour of Lexington's historic district with architect Frank Shirley highlights the front porches on colonial-style homes; and a look at how the homeowners are getting by without a kitchen.
12. Lexington Project 2015: Part 4: Smart Solutions
event 2015-01-24
How the roofers applied new architectural shingles to the house to coordinate it and the new addition; and a look at the progress on the back deck. Also: preventing the P-trap from the second-floor bathtub from interfering with the decorative ceiling of the kitchen; and finishing up the trim and decking on the corner deck stair.
13. Lexington Project 2015: Part 5: Making Connections
event 2015-01-31
How a small stream in the backyard affects the entire yard. Also: trees are removed; shade plants are relocated to a new bed in the side yard; a five-foot section of wall is cut away to connect the kitchen to the great room; and the kitchen's plumbing conditions are discussed.
14. Lexington Project 2015: Part 6: Exterior Details
event 2015-02-07
A look at the mudroom door; the work required to patch in new clapboard; the back deck's hybrid railing system; and the layout and design choices for the kitchen. Also: what goes into a rough electrical inspection; and what's trending in kitchens.
15. Lexington Project 2015: Part 7: Inspections
event 2015-02-14
Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.
16. Lexington Project 2015: Part 8: Conservation Concerns
event 2015-02-21
A covered gutter is installed; the infiltration system to disperse water from gutters into the ground is detailed; native plants that will return part of the lawn back to nature are discussed; and how existing aluminum wiring is being worked with while updating recessed light fixtures and installing sconces over the mantel. Also: the making and testing of two types of windows for the project.
17. Lexington Project 2015: Part 9: Old to New
event 2015-03-28
Progress on the mud room and kitchen
18. Lexington Project 2015: Part 10: Designer Details
event 2015-04-04
With the second floor sanded, stained and sealed, the crew commences work on the first floor; the custom refrigerator panels are spotlighted; and a chest of drawers is re-purposed as the sink base in the powder room. Also: local designer Robin Gannon shows how she decorated 22 rooms of an historic inn.
19. Lexington Project 2015: Part 11: New Walk, Old Stone
event 2015-04-11
The bluestone front walk is started despite significant grade challenges; porcelain tile made to look like slate is installed in the screen porch; and the vanity project is recapped. Also: selecting and fabricating antique granite for the front walk and custom house marker.
20. Lexington Project 2015: Part 12: Mudroom, Ventilation, Kids' Rooms
event 2015-04-18
A look at the LED ribbon strip lights being used under the cabinets in the kitchen and butler's pantry. Also: the mudroom storage system is built; the ventilation system is reviewed; wallpaper is applied to the ceiling in one bedroom; and decorative stripes are painted on an accent wall in another bedroom.
21. Lexington Project 2015: Part 13: Finishing Details
event 2015-04-25
New plants are added to the landscaping plan; and a wrought-iron chandelier with 52 bulbs is installed. Also: the radiators being used in the garage and upstairs sitting room; the upstairs laundry room; and the insulated steel garage doors that should help keep the heat inside the garage.
22. Lexington Project 2015: Part 14: Down to the Wire
event 2015-05-02
Installing tall fescue, which needs less water and fertilizer than other varieties; and designing the great room's entertainment center. Also: the finished mechanical room; and the final heating and cooling decisions.
23. Lexington Project 2015: Part 15: Garrison No More
event 2015-05-09
The transformation of the 1966 Garrison Colonial is reviewed. Included: the technology built into the new kitchen; the customization of the spaces over the garage; and the updates made to the older parts of the house.
24. Veteran's House 2015: Part 1: Veteran's Special House Project
event 2015-05-16
This Old House partners with Homes For Our Troops to build a house for Army veteran SSG Matt DeWitt. Kevin sees the plans for the DeWitt project. Norm, Tom and Kevin help with framing the exterior walls. Kevin meets the HFOT Chairman to understand their mission. Kevin meets another veteran who also received an adapted home. Kevin rejoins the project in New Hampshire to see the truss roof going up.
25. Veteran's House 2015: Part 2: Adaptions & Accessibility
event 2015-05-23
Kevin learns that Matt DeWitt’s disability doesn’t limit his cycling passion. Richard sees some of the 150 ADA approved requirements in the home. Kevin meets HFOT recipients Alex and Holly Dillmann. Richard learns about touchless faucet technology. Norm sees an ADA-compliant shower threshold and automatic door openers. Kevin meets Cat to discuss how life will be more manageable for Matt.
26. Veteran's House 2015: Part 3: A Home for Matt & Cat
End of season • event 2015-05-30
Kevin, Roger, Tom and Norm build a high tunnel greenhouse for Matt and his family. Kevin meets HFOT Community Outreach coordinator Chris Mitchell for Volunteer Day at the house. Kevin visits Army veteran Joe Beimfohr at his home. Closet builder Brian McSharry creates a special master closet design. Norm designs and builds a rustic dining table. The DeWitts finally move into their new home.
Show more expand_more
keyboard_double_arrow_down
This season's cast
Kevin O'Connor
Self - Host
Self - Host
favorite_border
Richard Trethewey
Self - Plumbing and Heating Expert
Self - Plumbing and Heating Expert
favorite_border
Norm Abram
Self - Master Carpenter
Self - Master Carpenter
favorite_border
Tom Silva
Self - General Contractor
Self - General Contractor
favorite_border
Roger Cook
Self - Landscape Contractor
Self - Landscape Contractor
favorite_border
Show more expand_more
keyboard_double_arrow_down